Excavation of Drains and Canals, Construction of Access Dams and Construction of Hydraulic Structures at Ithaca, West Bank Berbice, Region No. 5
- Client: Ministry of Agriculture, ASDU
- Brief Description: Excavation of Drains and Rehabilitation of Dam 10,000m, Installation of 4 Culvert, Construction of No. 2 Timber Bridges Construction of 200m of Heavy Duty Revetment
- Cost: G$140.9M
- Duration: 7 Months
Rehabilitation of Bridge No. 1 at Bagotstown, Region 4
- Client: Ministry of Public Infrastructure
- Brief Description: Construction of a Single Span Reinforced Concrete Bridge (120cu.m Concrete) inclusive of Construction of No. 16 .. .35m x .35m x 12.2m Long Prestress Concrete Piles Construction of No. 8.. 1.243m x .406m x 12..191m Long Prestress Desk Slabs
- Cost: G$34.7M
- Duration: 3 Months
Lethem Industrial Estate Infrastructure Development Works
- Client: Ministry of Business
- Brief Description: Rehabilitation/Construction of1800m Roadway to AC Finish Road
Installation of 5 Concrete Culvert Construction of Reinforced Concrete Drains 3000m
installation of Pipe Network 2500m - Cost: G$360.9M
- Duration: 16 Months
Rehabilitation and Construction of Bartica – Potaro Road Main Access Road: Mahdia to Denham Bridge
- Client: Ministry of Public Infrastructure
- Brief Description: Rehabilitation/Construction of 13.3 Km Roadway to Laterite Finish, Installation of 14 Culvert Construction of No. 6 Timber Bridges and No. 1 Reinforced Concrete Bridge with Steel Beams Construction of 200m of Heavy Duty Revetment
- Cost: G$419.7M
- Duration: 20 Months
Rehabilitation/Construction of Plum Park Road Network, Georgetown., Region 4
- Client: Ministry of Public Infrastructure
- Brief Description: Construction of 5,500 M2 at 1.5″ Thk. Asphaltic Concrete Roads with 1st Grade Crusher Run Base, White Sand/Sand Clay Sub Base
- Cost: G$41.3M
- Duration: 4 Months
Infrastructure Works at Perseverance Phase 3, East Bank Demerara, Region #4 – Lot 2
- Client: Ministry of Communities, Central Housing & Planning Authority
- Brief Description: Construction of Roads with 1st Grade Crusher Run (750 M3 ) White Sand/Sand Clay Sub Base, White Sand Sub Grade. Also Installation of Water Distribution Main and Construction of 5 Culverts
- Cost: G$73.7M
- Duration: 4 Months
Upgrading of Roads, No. 76 Village, Corentyne, Region # 6
- Client: Ministry of Communities, Central Housing & Planning Authority
- Brief Description: Construction of 5,715 m2 at 1.5″ Thk. Asphaltic Concrete Roads with 1st Grade Crusher Run Base, Laterite/White Sand Sub Base and 800M of Drainage Works
- Cost: G$36.7M
- Duration: 4 Months
Rehabilitation of Hope Bridge, East Coast Demerara, Region # 4
- Client: Ministry of Public Infrastructure
- Brief Description: Paving Existing Surface with 950 Tons Asphaltic Concrete and Road marking
- Cost: G$46.4M
- Duration: 12 Months
Rehabilitation of Liliendaal Acrow Panell Bridge Region No. 4 (105′ ft)
- Client: Ministry of Public Infrastructure
- Brief Description: Construction of a Three Span Reinforced Concrete Bridge inclusive of Construction of No. 41 .. .35m x .35m x 12.2m Long Prestress Concrete Piles, Construction of No. 8.. 1.243m x .406m x 12..191m Long Prestress Desk Slabs, Construction of No. 16.. 1.243m x .406m x 9.1461m Long Prestress Desk Slabs
- Cost: G$81.29M
- Duration: 4 Months
CIIP – Rehabilitation of West Indian Housing Scheme Access Road, Region 7
- Client: Ministry of Communities, Central Housing & Planning Authority
- Brief Description: Construction of 2,715 m2 at 1.5″ Thk. Asphaltic Concrete Roads with 1st Grade Crusher Run Base, Laterite/White Sand Sub Base and 800M of Drainage Works
- Cost: G$20.6M
- Duration: 5 Months
Construction of Tail Regulator at Buxton East Sideline, East Coast Demerara, Region # 4
- Client: Ministry of Agriculture, National Drainage and Irrigation Authority
- Brief Description: Construction of reinforced concrete culvert ( 35 Cum concrete) and Heavy Duty Timber revetment with Anchor piles and n tie rods and An (61 m)
- Cost: G$14.6M
- Duration: 7 Months
Urban Renewal on Carifesta Avenue: Avenue of the Caribbean (Upgrade to Carifesta Avenue) Lot Two (2): Civil Works
- Client: Ministry of Public Infrastructure
- Brief Description: Resurfacing of 23,345 M2 at 1.5″ Thk. Asphaltic Concrete Roads, Construct 4500 m Concrete Median and Road Marking 10500 m
- Cost: G$147.1M
- Duration: 6 Months