Excavation of Drains and Canals, Construction of Access Dams and Construction of Hydraulic Structures at Ithaca, West Bank Berbice, Region No. 5

  • Client: Ministry of Agriculture, ASDU
  • Brief Description: Excavation of Drains and Rehabilitation of Dam 10,000m, Installation of 4 Culvert, Construction of No. 2 Timber Bridges Construction of 200m of Heavy Duty Revetment
  • Cost: G$140.9M
  • Duration: 7 Months

Rehabilitation of Bridge No. 1 at Bagotstown, Region 4

  • Client: Ministry of Public Infrastructure
  • Brief Description: Construction of a Single Span Reinforced Concrete Bridge (120cu.m Concrete) inclusive of Construction of No. 16 ..  .35m x .35m x 12.2m Long Prestress Concrete Piles Construction of No. 8..  1.243m x .406m x 12..191m  Long Prestress Desk Slabs
  • Cost: G$34.7M
  • Duration: 3 Months

Lethem Industrial Estate Infrastructure Development Works

  • Client: Ministry of  Business
  • Brief Description: Rehabilitation/Construction of1800m Roadway  to AC Finish Road
    Installation of 5 Concrete Culvert Construction of Reinforced Concrete Drains 3000m
    installation of Pipe Network 2500m
  • Cost: G$360.9M
  • Duration: 16 Months

Rehabilitation and Construction of Bartica – Potaro Road Main Access Road: Mahdia to Denham Bridge

  • Client: Ministry of Public Infrastructure
  • Brief Description: Rehabilitation/Construction of 13.3 Km Roadway  to Laterite Finish,  Installation of 14 Culvert Construction of No. 6 Timber Bridges and No. 1   Reinforced Concrete Bridge with Steel Beams Construction of 200m of Heavy Duty Revetment
  • Cost: G$419.7M
  • Duration: 20 Months

Rehabilitation/Construction of Plum Park Road Network, Georgetown., Region 4

  • Client: Ministry of Public Infrastructure
  • Brief Description: Construction of 5,500 M2 at 1.5″ Thk. Asphaltic Concrete Roads with 1st Grade Crusher Run Base, White Sand/Sand Clay Sub Base
  • Cost: G$41.3M
  • Duration: 4 Months

Infrastructure Works at Perseverance Phase 3, East Bank Demerara, Region #4 – Lot 2

  • Client: Ministry of Communities, Central Housing & Planning Authority
  • Brief Description: Construction of   Roads with 1st Grade Crusher Run (750 M3 ) White Sand/Sand Clay Sub Base, White Sand Sub Grade. Also Installation of Water Distribution Main  and Construction of 5 Culverts
  • Cost: G$73.7M
  • Duration: 4 Months

Upgrading of Roads, No. 76 Village, Corentyne, Region # 6

  • Client: Ministry of Communities, Central Housing & Planning Authority
  • Brief Description: Construction of 5,715 m2 at 1.5″ Thk. Asphaltic Concrete Roads with 1st Grade Crusher Run Base, Laterite/White Sand Sub Base and 800M of Drainage Works
  • Cost: G$36.7M
  • Duration: 4 Months

Rehabilitation of Hope Bridge, East Coast Demerara, Region # 4

  • Client: Ministry of Public Infrastructure
  • Brief Description: Paving Existing Surface with  950 Tons Asphaltic Concrete and Road marking
  • Cost: G$46.4M
  • Duration: 12 Months

Rehabilitation of Liliendaal Acrow Panell Bridge Region No. 4 (105′ ft)

  • Client: Ministry of Public Infrastructure
  • Brief Description: Construction of a Three Span Reinforced Concrete Bridge inclusive of Construction of No. 41 ..  .35m x .35m x 12.2m Long Prestress Concrete Piles, Construction of No. 8..  1.243m x .406m x 12..191m  Long Prestress Desk Slabs, Construction of No. 16..  1.243m x .406m x 9.1461m  Long Prestress Desk Slabs
  • Cost: G$81.29M
  • Duration: 4 Months

CIIP – Rehabilitation of West Indian Housing Scheme Access Road, Region 7

  • Client: Ministry of Communities, Central Housing & Planning Authority
  • Brief Description: Construction of 2,715 m2 at 1.5″ Thk. Asphaltic Concrete Roads with 1st Grade Crusher Run Base, Laterite/White Sand Sub Base and 800M of Drainage Works
  • Cost: G$20.6M
  • Duration: 5 Months

Construction of Tail Regulator at Buxton East Sideline, East Coast Demerara, Region # 4

  • Client: Ministry of Agriculture, National Drainage and Irrigation Authority
  • Brief Description: Construction of reinforced concrete culvert ( 35 Cum concrete) and Heavy Duty Timber  revetment with Anchor piles  and n tie rods and An (61 m)
  • Cost: G$14.6M
  • Duration: 7 Months

Urban Renewal on Carifesta Avenue: Avenue of the Caribbean (Upgrade to Carifesta Avenue) Lot Two (2): Civil Works

  • Client: Ministry of Public Infrastructure
  • Brief Description: Resurfacing of 23,345 M2 at 1.5″ Thk. Asphaltic Concrete Roads, Construct 4500 m Concrete Median and Road Marking 10500 m
  • Cost: G$147.1M
  • Duration: 6 Months